Phone
(02) 9894 2732
Fax
(02) 9894 8210
Address
PO Box 7933
Baulkham Hills BC NSW 2153
FAST CURING TROWELLED FLOORING SYSTEM (1 HOUR)
TYPICAL APPLICATIONS
Meat / Poultry Industries, Food & Beverage Processing, Commercial Kitchens & Bars, Supermarkets, Loading Docks, Outdoor areas,
Rail Terminals & Ferry Concourses.
Profloor MMA - is designed as a fast curing fl oor topping system, where the curing of conventional epoxy systems does not meet
production or trading requirements of the business. The Profl oor MMA system is fully chemically cured within 1 hour of installation,
and trade can be resumed as usual without having negative effects on the fl oor surface. Profl oor MMA is also UV stable, and highly
recommended for outdoor applications. The trowelled fi nish is very durable, has high chemical resistance, and can be installed
between R10-R13, making it a very diverse product.